| Upgrades since the purchase in 2018 |
| NEW Upgrades / Additions / Service |
| Dri-Dek in both heads; 5/29/18 |
| Dri-Dek in dinghy and cockpit; 8/20/18 |
| Dock lines (3 braided, white, 3/4 x 35); 5/04/18 |
| Marine speakers for cockpit; May 2018 |
| Dual West Marine Stereo; SiriusXM ready; Bluetooth; May 2018 |
| 24" Samsung Smart TV; May 2018 |
| Samsung Bluray / DVD Player; July 2018 |
| ECHOGEAR Full Motion Articulating TV Wall Mount Bracket; 6/02/18 |
| Maputo LED Ceiling Lamps; 4 - 15-3/4" x 3-1/8" x 1"; 12/08/18 |
| JABSCO Twist 'n' Lock Toilet for Master Head; 12/08/18 |
| Todd Ladderback Seat June 2018 |
| Sling Seat for cockpit; 7/03/18; (bars, fabric, labor) |
| Doyle Sail Pack with Lazy Jacks; 7/03/18 |
| Covers for Jib Sail, Dinghy Chaps, Magma grill, Throw Rope, Flotation, & Six-man --- Raft; June 2018; (Fabric) |
| Custom Starboard Hardtop for Cockpit; August 2018 |
| Bomar Hatch in Hardtop |
| LED Lights on Hardtop in Cockpit; December 2018 |
| Marine Search Light with Controls; October 2018 |
| Plexiglass Windows; September 2018 |
| NextGen 3.5 KW Generator; 6/01/18; (parts & labor) |
| Intellian i5 Satellite Dish; July 2018 |
| Solid State Batteries; both engines |
| Battery for Battery Bank (replaced one of six batteries) |
| Changed out Zinc Ring and Anode Kit; 11/20/18 |
| Harken Pulleys for Dinghy; June 2018 |
| Fishing Rod Holders; May 2018; 4 - Stainless Steel |
| Oil Change & Filters on both engines and Injector lines tightened; 7/14/18 |
| GenSet installed & tested. A/C system checked; 6/23/18 |
| 2014 40 gauge Regalite custom enclosures six panels front and sides |
| 2014 six new port and two new hatch screens |
| 2014 both trampolines replaced with new |
| 2015 Spade anchor replaced with 45 pound Mantus anchor |
| 2014 AB 9 1/2 foot hard bottom inflatable with cover |
| October 2015 New AGM starting batteries and six new house batteries |
| October 2016 Wind generator Silent X |
| October 2016 Spinlock three line clutch replaced |
| April 2017 starboard heat exchanger/exhaust elbow on both engines/water pump replaced |
| 2017 Jib halyard |
| 2018 March Refrigerator control module upgrade |